Hoosier Energy’s Lanesville solar site came full circle after 10 years when it was decommissioned in 2026.

 

One of 10 1MW solar sites established by Hoosier Energy following Board approval in 2014, Lanesville began operation in 2016 within the service territory of member cooperative, Harrison REMC.

 

Lanesville was built early in the project and one of just three of those solar sites using base inverters. The other seven used string inverters. The difference between those two types of sites was noticeable, particularly at Lanesville, which had a higher operating cost than expected due to lower generation and higher maintenance costs.

 

It was part of a learning experience with these early solar sites, allowing Hoosier Energy and its members to gain valuable lessons about equipment performance, maintenance requirements, technology obsolescence, site conditions and the long-term economics of solar generation.

 

With leases coming due on these solar sites, Hoosier Energy conducted strategic evaluations from 2024 to 2026. During 2025, the sites were evaluated using a Cost-Benefit Matrix with Lanesville ranking the lowest in financial and technical categories. As a result, Lanesville was the sole site recommended for decommissioning with the lease expiration set to take place in March of 2026.

 

Harrison REMC aligned with Hoosier Energy’s recommendation in January of 2026, and following a formal presentation to the Hoosier Board of Directors, the decommissioning process moved forward.

 

Blackwood Solutions was contracted to complete the work, which began on June 15, 2026. Hoosier Energy substation crews first coordinated electrical isolation and completed the permanent utility disconnect, including removal of the potential transformers and confirmation of the 102 feed serving the solar site.

 

Blackwood then began dismantling the facility. The work included removal of approximately 4,300 solar panels, tracking systems, inverters, transformers, wiring, communications antennas and other above-ground infrastructure.  All removed materials were recycled, repurposed or properly disposed of with full documentation and manifests. Underground infrastructure located more than 36 inches below the surface was left in place.

 

Site conditions created some unexpected challenges. An internal swale created a wet, low-lying area that required composite matting in order to safely move heavy equipment across the property. At one point, flooding displaced the mats, requiring them to be repositioned and secured with concrete blocks before work could continue.

 

Following equipment removal, Chastain Excavating was contracted to handle site grading and address drainage issues. Due to the site’s location on a hillside, erosion played a factor in restoring the fields to their natural conditions.

 

Hoosier Energy’s vegetation management team completed reseeding the fields, restoring them to their original condition and stabilizing the soil.

 

The decommissioning provided another important learning opportunity, giving Hoosier Energy direct experience with contractor selection, equipment removal, recycling and disposal, site restoration, drainage, erosion control, and the overall cost and timeline associated with retiring a solar facility.

 

The Lanesville solar site served the purpose for which it was originally developed: to provide practical experience in solar generation. Its decommissioning demonstrates Hoosier Energy’s continued commitment to responsibly managing member resources while providing safe, reliable and affordable energy to its member cooperatives and their member-consumers.